The project involved the construction of a multi-story underground parking garage (7 levels) using the top-down technique in the center of Cortina d’Ampezzo. The project was particularly complex both from a structural and geotechnical perspective, due to the nature of the soils (plastic clays related to ancient landslides), the complex multi-aquifer hydrogeological system, and the proximity to existing buildings. ITS specifically oversaw the operational management and part of the geotechnical monitoring. In particular, data related to remote monitoring and spot monitoring with various techniques were correlated. Additionally, the renovation project of the former Pocol Cable Car departure station was carried out, which involved the stabilization of the slope at the base of the building using self-drilling bars.