For the start of the “Cortina 2021” Alpine Ski World Championship, ANAS Spa, in agreement with the Ministry of Infrastructure and Transport, has launched an initiative aimed at solving the largest number of critical points of mobility present along the “Alemagna” road, in the stretch between Pian de Vedoia and Cortina. At the Longarone section, the goals of the interventions are the resolution of the functional deficiency of the crossing towards Vald Zoldana, at the southern entrance of Longarone, and the safety and geometric and performance adjustment of the section of the main road between junction and the Termin tunnel at north of the town of Castellavazzo. Among the main works of art designed, 3 new bridges with a mixed steel and AC section, the seismic adaptation of two existing bridges, and the adaptation of a railway overpass to the Conegliano-Calalzo line. The road and structural design were carried out with a BIM methodology, starting from the LIDAR survey of the entire route.