Summit section in the Municipalities of Valdisotto and Valdidentro
Emergency interventions to secure the Provincial connecting road infrastructure insisting on the Po River – bridge between the municipalities of Dosolo (MN) and Guastalla
Construction work of the definitive bridge over the Trebbia River in Municipality of Corte Brugnatella
Construction of longitudinal and transverse hydraulic forestry works, Todesh township to safeguard against overflows and debris flows debris flows with involvement of existing structures in the municipality of Vallada
ITS SRL
Corte delle Caneve, 11 31053
Pieve di Soligo (TV) Italy
Tel: +39 0438 82082
E-mail: info@its-engineering.com
C.F. & P.IVA 02146140260
REA 351225 CAP. SOC. 100.000,00€